Specifications

Contents
x
Cisco ONS 15454 Installation and Operations Guide, R3.2
March 2002
6.7 Creating a Path Trace 6-12
Create a J1 Path Trace 6-13
6.8 Cross-Connect Card Capacities 6-15
6.8.1 VT1.5 Cross-Connects 6-16
6.8.2 VT Tunnels 6-19
6.9 Creating DCC Tunnels 6-21
Provision a DCC Tunnel 6-22
Card Provisioning 7-1
7.1 Performance Monitoring Thresholds 7-1
7.2 Provisioning Electrical Cards 7-2
7.2.1 DS-1 Card Parameters 7-3
Modify Line and Threshold Settings for the DS-1 Card 7-3
7.2.2 DS-3 Card Parameters 7-6
Modify Line and Threshold Settings for the DS-3 Card 7-6
7.2.3 DS3E Card Parameters 7-8
Modify Line and Threshold Settings for the DS3E Card 7-9
7.2.4 DS3XM-6 Card Parameters 7-11
Modify Line and Threshold Settings for the DS3XM-6 Card 7-12
7.2.5 EC1-12 Card Parameters 7-14
Modify Line and Threshold Settings for the EC-1 Card 7-14
7.3 Provisioning Optical Cards 7-18
7.3.1 Modifying Transmission Quality 7-18
Provision Line Transmission Settings for OC-N Cards 7-18
Provision Threshold Settings for OC-N Cards 7-19
7.3.2 Provisioning OC-N Cards for SDH 7-23
Provision an OC-N Card for SDH 7-24
7.4 Provisioning IPPM 7-24
Enable Intermediate-Path Performance Monitoring 7-25
7.5 Provisioning the Alarm Interface Controller 7-26
7.5.1 Using Virtual Wires 7-26
Provision External Alarms 7-27
Provision External Controls 7-28
7.5.2 Provisioning AIC Orderwire 7-29
Provision AIC Orderwire 7-29
7.5.3 Using the AIC Orderwire 7-30
7.6 Converting DS-1 and DS-3 Cards From 1:1 to 1:N Protection 7-30
Convert DS1-14 Cards From 1:1 to 1:N Protection 7-31