User guide

PTP 800 Series User Guide Installing antennas and ODUs
phn-2513_004v000 (Oct 2012)
5-13
6
Check that the RMK and ODU are correctly mounted on the mast or pole.
Assembling the flexible waveguide hangers
To provide adequate support for a 900mm flexible waveguide, install two hangers. To
assemble the flexible waveguide hangers, proceed as follows:
1
Check the flexible waveguide hanger kit contents.
2
Assemble the pole clip, making note of the angle of the slots in the metal strip.