User guide
Preparing for installation Chapter 5: Installation
5-4
phn-2513_004v000 (Oct 2012)
Equipment to be Installed Tools Required
Coupler 6mm Allen key
2.5mm and 3mm Allen keys (supplied)
Lubricant (supplied)
Antenna 17mm spanner
7 mm spanner (for tapered transition)
Voltmeter and BNC lead
Compass and GPS meter
Cable Cable cutters
Cable hoist
Flat file to dress the cable inner core
Wire brush to comb the braid
Crimp tool Cambium part 66010063001
Torque wrench
Unit pre-configuration
To pre-configure the CMUs during staging before site installation (if this is required),
follow this process:
1
Perform the following tasks from Chapter 6: Configuration and alignment for
each CMU:
from Task 1: Connecting to the unit on page 6-3,
to Task 11: Configuring remote access on page 6-96.
2
Install and test the new hardware by following the relevant procedures in this
chapter.
3
Align the antennas and complete the configuration by performing the following
tasks from Chapter 6: Configuration and alignment:
from Task 12: Aligning antennas on page 6-98,
to Task 15: Connecting link to the network on page 6-114.