Programming instructions

82
3300 ICP Technician’s Handbook
Perform the Maintenance Checks
15. Verify that none of the NSUs is loading. If they are, wait until they have
finished loading (L0/L1 LEDs are not marching).
16. When the system has finished resetting, log back into ESM.
17. In the All forms (alphabetical) list, click Maintenance Commands.
18. Enter the dbms stat command to verify the DBMS save, and that the
DBMS_Initialized flag is on.
19. Issue the Type *.dr.logfile_1 command to display the log file created
during the Data Restore. When the checks are complete, review the
log to ensure there were no errors during the restore procedure.
20. Issue the mess sub command to check the programmed NSU links;
they should be OPEN. If any programmed links are in SCAN, check
the LINK STATUS LEDs; if the amber LEDs are marching, this means
that the NSUs are writing to the RAM DISK.
21. Upgrade the IP telephones and force lease renewals. Issue the LOAD
IPDevice 1 to X maintenance command (where X represents the last
IP device number) to upgrade the IP phones.
22. If the system has a peripheral cabinet with DNI line cards, enter the
Load x x x command to load the DNI cards and the latest DNI line
load.
23. Back up the database (see “Back Up a Database” on page 61).
Tip: Complete the following Maintenance Checks only after a restore.
CAUTION: Do not reset system components while
executing the following checks.
Tip: If you have an IP console, you must:
- Cycle the power on the IP TKB (key pad).
- Upgrade the IP Console software (if required).
- Renew the IP address for the console PC (if required).
Power down or at the DOS prompt enter ipconfig /release
and then ipconfig /renew.