Programming instructions
124
3300 ICP Technician’s Handbook
7. Set the main board on a flat surface with the under side facing up.
8. Seat the E2T onto the main board and secure with four screws.
9. Set the main board on the chassis and attach to the chassis with the
captive screw.
10. Attach the cables to the main board.
11. Connect the ribbon cable to the interconnect card or RAID controller.
12. Replace the cover and reconnect the cables to the controller.
13. Power up the controller (see page 22).
Figure 17: MXe: RTC / E2T/ APC on the Main Board, bottom view