Release Note

5-13
Cisco Unified CCX Historical Reports User Guide, Release 7.0(1)
Chapter 5 Scheduling Historical Reports
Choosing Schedule Settings
Step 5 Set Range of Recurrence options as follows:
For a schedule that is set to occur once, choose these settings in the Range of
Recurrence area:
In the Start Date field, specify the date that you want the schedule to execute.
Every weekday (Monday
through Friday)
Note This report will run
every Tuesday through
Saturday so that it can
include information for
Monday through Friday.
Daily Click the Every weekday radio button.
Every week on a certain day (for
example, every week on Friday)
Weekly Enter 1 in the Every n Week(s) On field, and then
click the radio button for the desired day.
Every specific number of weeks
on a certain day (for example,
every 2 weeks on Monday)
Weekly Enter the number of weeks in the Every n Weeks(s)
On field, and then click the radio button for the
desired day.
Every month on a specific date,
(for example, the 15th of every
month)
Monthly Click the Day n of calendar month radio button.
Then enter the date in this field, or you can click the
drop-down arrow and click the scroll arrow to
display the date that you want and then click the
date. (If you enter a date that does not occur in some
months, for example 30 or 31, the system will use
the last day of the month for months that do not
contain the date.)
Every month on a certain day
(for example, the second Friday
of every month, or the last
Sunday of every month)
Monthly Click the The number day of calendar month radio
button. Click the drop-down arrow in the first field
and choose the number of the day. Then click the
drop-down arrow in the second field and choose the
name of the day.
One time Once In the Report Start Date and Report End Date fields,
specify the dates and times of the first and last data
that you want to include in the report.
If You Want the Schedule to
Execute This Often
Click This
Radio Button Then Perform These Actions