Installation Guide

CommentsReferenceActionTime EstimateStep
None.Administrative
Workstation (AW)
Upgrade the AWs, PGs,
RMS, and CIS
components.
1 hour per
node
12
Upgrade Procedures (page
67)
Peripheral Gateway (PG)
Upgrade Procedures (page
99)
Remote Monitoring
System (RMS) Upgrade
Procedures (page 123)
CIS Upgrade Procedures
(page 117)
ICM/IPCC Component Upgrade Process
Following chapters provide information on the upgrade process for each major ICM/IPCC
component. The process assumes that most components are congured redundantly, typically
Side A and Side B. For ICM/IPCC 7.0(0), the database migration uses a process and tool called
the Enhanced Database Migration Tool (EDMT) (see Enhanced Database Migration Tool for
ICM/IPCC 7.0 (page 125)). This tool is referenced in the step-by-step procedures in this document.
Note:
The phrase ICM/IPCC core components or core components refers to the following ICM
components: CallRouter, Logger, Administrator Workstations (AWs), Peripheral Gateways
(PGs), CTI Servers (CGs), CTI OS Servers, Historical Data Server (HDS), WebView Server.
The phrase ICM Central Controller or ICM Central Controller components refers to the
following ICM components: CallRouter, Logger, key Distributor AW (with or without HDS,
HDS with or without WebView Server).
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
65
Chapter 7: Upgrade Procedures
ICM/IPCC Component Upgrade Process