Installation Guide

CommentsAction/ReferenceStep/Completed
None.8. Bring down the side B CallRouter,
Logger, and all distributor and Client
AWs.
Refer to How to Bring Side A into Service (page 93).
None.
__________
Bring up the upgraded Side A
CallRouter and Logger.
__________
Point the temporary HDS/Distributor
AW to the upgraded Side A
CallRouter and Logger.
__________
Refer to CallRouter Common Ground Upgrade: Side B
(page 95).
9. Upgrade the Side B CallRouter.
__________
Refer to Logger Common Ground Upgrade: Side A/B
(page 87).
10. Upgrade the Side B Logger.
__________
**************************************End of Central Controller Upgrade
Maintenance Window
Refer to Distributor AW/HDS Common Ground Upgrade
(page 78).
11. Upgrade the Side B
HDS/Distributor AW.
__________
None.12. Bring up the Upgraded Side A
HDS/Distributor AWs, when
available, at any point after Step 8.
__________
None.13. Bring up the Upgraded Side B
HDS/Distributor AW.
__________
Refer to Administrative Workstation (AW) Upgrade
Procedures (page 67).
14. Upgrade the AWs, PGs, RMS,
and CIS components.
Refer to Peripheral Gateway (PG) Upgrade Procedures
(page 99).
__________
Refer to Remote Monitoring System (RMS) Upgrade
Procedures (page 123).
Refer to CIS Upgrade Procedures (page 117).
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
162
Chapter 20: - Upgrade Checklists
Common Ground Upgrade Checklists