Installation Guide

CommentsAction/ReferenceStep/Completed
AD considerations for upgrade:2. Create the Active Directory
environment.
Migrating users from the old domain to the new
domain using the Domain Conversion Tool.__________
Put the new servers in the Active Directory domain
in the appropriate ICM OU.
Validate IP connectivity and remote access.
If the AD domain controller is on the Logger, migrate
the domain controller roles to new non-ICM servers.
Note: Refer to "Migrating Active Directory and DNS
to a Non-ICM Server" for additional information.
Bring up the new domain controllers on the domain
in which the ICM operates.
Transfer any applicable exible single master
operations (FSMO) roles.
Demote the domain controller on the production
Logger to a member server.
For additional information refer to Domain Conversion
Tool and Active Directory (page 45).
Refer to Setting Up a Temporary ICM/IPCC AW/HDS
(page 80).
3. Set up a temporary 7.0
HDS/Distributor AW.
__________
**************************************Start of Central Controller
Upgrade Maintenance Window
Refer to Distributor AW/HDS Common Ground Upgrade
(page 78).
4. Upgrade the Side A
HDS/Distributor AW.
__________
Refer to Logger Common Ground Upgrade: Side A/B
(page 87).
5. Upgrade the Side A Logger.
__________
Refer to CallRouter Common Ground Upgrade: Side A
(page 92).
6. Upgrade the Side A CallRouter.
__________
Refer to the WebView Installation Guide
7
.
7. Install the WebView server(s) if
not co-located on the AW/HDS.
__________
7) http://www.cisco.com/univercd/cc/td/doc/product/icm/icmentpr/icm70doc/report7/index.htm
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
161
Chapter 20: Upgrade Checklists
Common Ground Upgrade Checklists