Product specifications

Deploying a Converged Storage Network Using a Cisco FCoE Switch
19
Conclusion
This document summarized how to plan for, manage, and implement an FCoE pilot. This step-by-step
guide provided guidance on the implementation of a unified fabric. The reference architecture
described in this guide was assembled from equipment that was available in the Oracle Solution Center
located in Broomfield, Colorado. You will need to substitute your own equipment, and modify the
installation and validation process based on your equipment and management tools.
Additional resources, a description of the equipment used, and DCB terms and definitions are available
in the following appendixes.