Product specifications
Deploying a Converged Storage Network Using a Cisco FCoE Switch
7
SG-(X)EMFCOE2-Q-SR, (short-range optics)
SG-(X)EMFCOE2-Q-TA (twin-axial copper)
1
Cisco
Nexus™ 5000 Series FCoE
switch
1
Sun ZFS Storage Appliance
Sun ZFS Storage 7000 Series
1
Sun Storage 6000 Series Array
Sun Storage 6180 Array
Installation
This section describes how to set up an FCoE environment. It assumes a general understanding of
SAN administration concepts. The installation process consists of the following steps:
1. Determine the configuration.
2. Install CNAs.
3. Configure switches and zoning so that CNAs and storage can see each other.
4. Configure storage to assign LUNs to CNAs.
5. Verify equipment connectivity.