Installation Guide

7-22
Cisco Intelligent Automation for Cloud Installation Guide
OL-29971-02
Chapter 7 Configuring Cisco IAC With the Wizard
Creating Resources for Network Services
Creating an Internet Transit Network (Optional)
This is for use in Advanced Network Services to provide Internet Transit Network Connectivity to
Organizations. Connectivity from Tenant Org CSRs to the Datacenter/Provider Edge ASRs.
Note The steps for this procedure are the same as outlined in the Creating a Service Network, page 7-20.
Creating the Service Resource Container (Optional)
This is where the Compute POD is associated with the Infrastructure, Service and Internet Transit
Networks. In addition, this is also where the target Cluster and Datastore to be used within the Datacenter
(identified by the Compute POD) is selected. One place the Service Resource Container is used is during
Creation of Organizations to specify the Network an Compute resources to be used by that Organization.
Note The Service Resource Container is required for ANS and OpenStack.
Configuring Resources for Network Services (Optional)
From the Wizard, choose Configure Resource for Network Services.
Note The steps for this procedure are the same as outlined in the Creating a Service Network, page 7-20.
Adding a Public Subnet to Network POD (Optional)
Note This is the subnet IPs for Advanced Network Services UnProtected Public Tenant Network and VMs,
Floating IPs (Static NAT), and Public VIPs.
Step 1 From the Wizard, choose Add Public Subnet to Network POD.
Step 2 On the Add Public Subnet to Network POD form, enter the following:
Subnet Address. The network address of the subnet.
Subnet Bitmask. The bitmask (numeric) of the subnet you are adding. Do not include the slash.
Network POD Name.
Assigned Subnets. The public subnets that have already been assigned.
Unassigned Subnets. The free public subnets remaining in the pool.
Step 3 Click Submit Order.
Step 4 Click on the number in the Requisition Number field to display the details.
Step 5 Click Close when the status says Completed.