Installation Guide

G-1
Cisco Intelligent Automation for Cloud Installation Guide
OL-29971-02
APPENDIX
G
Upgrading Cisco PPM to the Full License
The Trial (demo) edition of Prime Performance Manager (PPM) ships with Cisco IAC 3.0.2 Management
Appliance. In order to leverage the benefits of the Full (licensed edition) of PPM (1.5.1), you will need
to uninstall the demo version and then install the licensed version. How to do so (with an option to save
your data, if required) is explained in this section. You must be logged in as a Cloud Provider Technical
Administrator (CPTA) to complete this task.
Note You organization will first need to purchase the Full license for Prime Performance Manager 1.5.1. For
more information, see your Cisco Sales Representative.
Hardware Requirements for the Demo/Trial/PoC Version of PPM
The maximum number of network elements that can be managed by the small demo / proof of concept
hardware is shown in detail below.
Tabl e 7- 1 Network Size (Maximum)
Number of Devices 200
Number of PWE3 Links 12,400
Number of Interfaces 37,600
Number of Interfaces with Stats 20,900
Table 7-2 Recommended Hardware Configurations
CPU CPU Type
non-NEBs Compliant
Systems
NEBs Compliant
Systems
Cisco UCS C22M3 4-core (UCS C22M3) Xeon E5-2407v2 2.4 GHz
4-core (UCS C22M3) Xeon E5-2407 2.2 GHz
Cisco UCS C220M3 4-core (UCS C220M3) Xeon E5-2609v2 2.5 GHz
4-core (UCS C220M3) Xeon E5-2609 2.4 GHz