Installation guide
3-13
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
Chapter 3 Switch Installation (8-Port Switches)
Installing the Switch
Figure 3-6 Installing the Switch On a Wall
After the switch is mounted on the wall, do these tasks to complete the installation:
1.
Power on the switch. See the “Verifying Switch Operation” section on page 3-5.
2.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
3.
Connect to the front-panel ports. See the “Connecting to the 10/100 and 10/100/1000 Ports” section
on page 2-14, the “Connecting to SFP Modules” section on page 2-18, and the “Connecting to a
Dual-Purpose Port” section on page 2-20 to complete the installation.
For configuration instructions about using the CLI setup program, go to Appendix C, “Configuring the
Switch with the CLI-Based Setup Program.”
1 Switch 3 Slides on this way
2 Screw
3
1
2
2
2
204629