Installation guide

4-7
Cisco 10000 Series Routers Line Card Hardware Installation Guide
OL-6773-04
Chapter 4 4-Port Channelized T3 Half-Height Line Card Overview
Cables and Connectors
Caution Do not install Y-cables unless you are using the Y-cable redundancy feature and have read all of these
instructions.
Caution The Y-cables must be installed before configuring redundancy, and removed before deconfiguring
redundancy.
Eight BNC ports are arranged vertically per line card slot.
Two BNC connectors, one TX and one RX, are used per port.
Two 4-port channelized T3 half-height line cards can be placed in one slot, using the Carrier, with
four BNC ports allocated for each 4-port channelized T3 half-height line card.
When the 4-port channelized T3 half-height line card is in subslot 0 (the top subslot), the BNC
connectors in use are ports 0 through 3.
When the 4-port channelized T3 half-height line card is in subslot 1 (the bottom subslot), the BNC
connectors in use are ports 4 through 7.
Optional Y-Cables
Caution Read all of the information in this section before installing a Y-cable for redundancy.
Figure 4-4 shows the Y-cable. Figure 4-5 shows Y-cable connections. The product number for the
optional Y-cable is CAB-BNC-71NY=.
Figure 4-4 Optional Y-Cable
126153