Specifications

Table Of Contents
5-2
Cisco AS5800 Operations, Administration, Maintenance, and Provisioning Guide
DOC-7810814=
Chapter 5 Maintenance
Replacement Procedures
Powering Off the Access Server
Some procedures in this section require you to power off the access server. See this section when
appropriate.
Powering off the access server involves removing power from the following components:
Router shelf
Dial shelf
AC-input power shelf, if applicable
Warning
Before working on equipment that is connected to power lines, remove jewelry
(including rings, necklaces, and watches). Metal objects will heat up when connected
to power and ground and can cause serious burns or weld the metal object to the
terminals.
Step 1 Power OFF (O) the power switches located on the router-shelf rear panel.
Figure 5-1 Router-Shelf Power Switches
H11572
NETWORK PROCESSING ENGINE-150
Power switches