System information

64 IBM and Cisco LAN Switching: Interoperability and Migration Guide
Figure 43. VLAN Membership
Now that we have assigned the ports we want to use, we have to move back
to the Port Group (EtherChannel) menu (Figure 23 on page 44), and add port
Fa0/7 and Fa0/8 to Group 1, as we did in the earlier Lab 2: VLAN and
trunking on IBM 8275 and Cisco 2924 on page 46. Now we have configured
the EtherChannel, and end the task by clicking Apply to apply the changes to
the configuration.
3.3.2.3 Lab 2 conclusions and verification of the configuration
To verify our configuration we connected workstations to ports Fa0/1 to Fa0/4
on the Cisco switch, and ports 1 to 4 on the IBM switch. We used a ping test
to verify connectivity between the ports at the two switches, as well as
connectivity between the two switches connected together with the
EtherChannel. To verify the VLAN connectivity over the trunk as well as the
trunks capability to partly recover loss of connectivity,we disconnected one