A. The command enables loop guard and root guard.
B. The command changes the status of loop guard from the default of disabled to enabled.
C. The command activates loop guard on point-to-multipoint links in the switched network.
D. The command disables EtherChannel guard.
Correct Answer: B
QUESTION 56
What does the interface subcommand switchport voice vlan 222 indicate?
A. The port is configured for both data and voice traffic.
B. The port is fully dedicated to forwarding voice traffic.
C. The port operates as an FXS telephony port.
D. Voice traffic is directed to VLAN 222.
Correct Answer: A
QUESTION 57
When you create a network implementation for a VLAN solution, what is one procedure that you
should include in your plan?
A. Perform an incremental implementation of components.
B. Implement the entire solution and then test end-to-end to make sure that it is performing as
designed.
C. Implement trunking of all VLANs to ensure that traffic is crossing the network as needed
before performing any pruning of VLANs.
D. Test the solution on the production network in off hours.
Correct Answer: A
QUESTION 58
You have just created a new VLAN on your network. What is one step that you should include in
your VLAN-based implementation and verification plan?
A. Verify that different native VLANs exist between two switches for security purposes.
B. Verify that the VLAN was added on all switches with the use of the show vlan command.
C. Verify that the switch is configured to allow for trunking on the switch ports.
D. Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
Correct Answer: B