Installation guide

2
Cisco Clock Module (WS-C6K-CL and WS-C6513-CL) and VTT Module (WS-C6K-VTT) Installation Note
78-10498-05
Contents
Contents
This publication consists of the following sections:
Parts List, page 2
Required Tools, page 2
Safety Overview, page 3
Checking the VTT Module and Clock Module, page 3
Replacing the VTT Modules and Clock Modules, page 4
Related Documentation, page 8
Obtaining Documentation, page 9
Documentation Feedback, page 9
Obtaining Technical Assistance, page 10
Obtaining Additional Publications and Information, page 11
Parts List
The following parts are included in the replacement kit:
WS-C6K-VTT=
Three VTT modules
One disposable grounding wrist strap
One bag of spare module screws (silver)
One bag of spare front panel screws (black)
WS-C6K-CL= and WS-C6513-CL=
One clock module
One disposable grounding wrist strap
One bag of spare module screws (silver)
One bag of spare front panel screws (black)
Required Tools
These tools are required to perform the installation:
Number 1 Phillips screwdriver
Your own ESD-prevention equipment or the disposable grounding wrist strap included with all
upgrade kits, field-replaceable units (FRUs), and spares