Installation guide
Contents
v
Cisco 6260 Hardware Installation Guide
OL-2365-02
2.4 Unpacking the Cisco 6260 System 2-18
2.5 Verifying Contents 2-18
2.6 Inspecting for Damage 2-18
CHAPTER
3 Installing a Cisco 6260 with a POTS Splitter Configuration 3-1
3.1 Installation Checklist 3-2
3.2 Installation Procedures 3-3
3.2.1 Measure Rack Space 3-3
3.2.2 Install the Third-Party POTS Splitter 3-3
3.2.3 Attach Ear Brackets to the Cisco 6260 3-4
3.2.4 Install the Cisco 6260 Chassis 3-5
3.2.5 Install Blank Faceplates 3-6
3.2.6 Ground the Cisco 6260 3-7
3.2.7 Ground the Third-Party POTS Splitter 3-8
3.2.8 Connect the Cisco 6260 to the Third-Party POTS Splitter 3-9
3.2.9 Connect the Third-Party POTS Splitter to the MDF or to the Cross Connect 3-9
3.2.10 Attach Cisco 6260 Power Connections 3-9
3.2.11 Connect the Alarm and BITS Clock Contacts 3-13
3.2.12 Apply Power 3-14
3.2.13 Verify Fan Tray Operation 3-15
3.2.14 Connect the Cisco 6260 System to the Network 3-15
3.2.14.1 E3 Network Connection 3-15
3.2.14.2 E1 Network Connection 3-16
3.2.14.3 OC-3c Network Connection 3-17
3.2.15 Install a Subtended Network Configuration 3-18
3.2.15.1 Connect the E3 Subtending Network Configuration 3-18
3.2.15.2 Connect the E1 Subtending Network Configuration 3-19
3.2.15.3 Connect the OC-3c Subtending Network Configuration 3-20
3.2.16 Connect the Ethernet to the Management Network 3-20
3.2.17 Connect a Console Terminal 3-21
3.2.18 Connect the Auxiliary Port 3-21
3.2.19 Complete Initial Configuration 3-22
3.2.19.1 Before You Begin 3-22
3.2.19.2 Using the System Configuration Dialog 3-22
CHAPTER
4 Installing a Cisco 6260 Without a POTS Splitter Configuration 4-1
4.1 Installation Checklist 4-2
4.2 Installation Procedures 4-2
4.2.1 Measure Rack Space 4-2