Quick Start Guide
12
OL-16715-01
Deploying Controller-Based Access Points
In the controller-based architecture, you can deploy up to six controller-based
AP521s and configure them using the CCA. This procedure assumes that you
are using a UC500, a CE520, a WLC526, and the CCA.
Refer to the Cisco Smart Business Communications System Setup document,
Section 4, ”Deploy Advanced Wireless,” and follow the steps listed there.
Note Before you can deploy controller-based AP521s, you must first
configure the WLC526. See the Quick Start Guide: Cisco 526 Series
Wireless Express Mobility Controller for instructions.
Mounting the Access Point
The AP521 can be mounted as follows:
• On a horizontal or vertical surface
• On a suspended ceiling
• Above a suspended ceiling
• On a network cable box
• On a desktop










