Technical data

TraverseEdge 2020 Applications and Engineering Guide, Chapter 3: System Applications
Page 3-10 Turin Networks Release 5.0.x
For physical layer module part numbers and availability, refer to the TE-2020 Ordering Guide
(WR-D2020-ORD-050000).
For detailed physical descriptions of the modules, refer to the TE-2020 Hardware Description
Guide (WR-D2020-HWD-050000).
3.2.2 Terminal Node with 192 DS3/EC-1 Drops
Figure 3-12 shows a typical 1+1 terminal configuration with 192 DS3/EC-1 signal drops. This configura-
tion requires only fourteen rack units of space.
Table 3-3 Single Terminal Shelf Equipment Requirements
QTY Part
1 TE-2020 Main Shelf
2 TE-2020 Main CCT
1 TE-2020 Main Fan Tray
2 OC-192 x1 PLM
4 OC-48 x1 PLM