Specifications

3-6
Cisco ONS 15216 EDFA2 Operations Guide
78-13908-02
Chapter 3 Installation
Communications
Optical Connection Procedure
Warning
Follow all directions and warning labels when working with optical fibers. To prevent eye damage,
never look directly into a fiber or connector.
Connect the customer-supplied fiber optic patchcords to the SC/UPC optical ports of the ONS 15216
EDFA2 using the following procedure. Refer to Figure 3-1 while performing this procedure:
Step 1 Clean both ends of the two fiber optic patchcords.
Step 2 Connect the first patchcord between the ONS 15216 EDFA2 OUTPUT connector and the FACILITY
LINE connection.
a. Approximately –3.5 dBm.
Step 3 Connect the second patchcord to TERMINAL OUTPUT. Measure and record the total optical power:
a. DWDM/OADM output
b. Terminal transmitter output
Step 4 If optical power at the end of the TERMINAL OUTPUT patchcord is less than or equal to +4 dBm,
connect the end to the ONS 15216 EDFA2 input. If the optical power is greater than + 4 dBm, additional
optical attenuation is required to bring optical power below + 4 dBm.
Figure 3-1 ONS 15216 EDFA2 Optical Connections
Optical Amplification Operation Verification Procedure
To verify ONS 15216 EDFA2 optical amplification, use the following procedure:
Step 1 Connect an optical power meter to the MON OUT port.
Step 2 Measure and record the output power. The MON OUT port level is –20 dB less than the signal.
Step 3 Verify that the ONS 15216 EDFA2 input and output power are within the range shown in Table 3-3.
For example, if the total input power is between –27 dBm and –5 dBm, expect an output power between
–5 dBm and 17 dBm.
Fiber output
monitor
Fiber
output
Fiber
input
71175
-48V A
R A
POWER
FAIL
LOS