Specifications
CHAPTER
3-1
Book Title
78-13113-06 B0
3
Installing and Removing the Uplink Cards
This chapter provides information about installing and removing the uplink cards. The following
sections are in this chapter:
• Tools and Equipment Required, page 3-1
• Preparing for Installation, page 3-2
• Removing the Cable-Management System, page 3-4
• Removing the Uplink Card, page 3-8
• Installing an Uplink Card, page 3-9
• SONET Distance Information for RPR/SRP, DPT, and POS/DPT Uplink Cards, page 3-11
• Connecting the Ports on the RPR/SRP, DPT, and POS/DPT Uplink Cards, page 3-12
• Installing the Cable-Management System, page 3-15
• Turning On Power to the Router, page 3-16
• Verifying Uplink Card Functionality, page 3-23
• Configuring the RPR/SRP, DPT, and POS/DPT Uplink Card Interfaces, page 3-23
Tools and Equipment Required
The following tools are required to install or remove an uplink card on the Cisco 10720 Internet Router:
• ESD-preventive wrist strap
• 1/8-inch flat-blade screwdriver
• Number 1 Phillips screwdriver
• Antistatic bag
• Cable ties
• Antistatic mat (optional)
• Uplink card