user manual
18-70
Cisco ONS 15600 SDH Procedure Guide, R8.0
October 2007
Chapter 18 DLPs F300 to F399
DLP- F357 Cancel a Roll
Step 3 Click the rolled circuit that you want to delete.
Step 4 From the Tools menu, choose Circuits > Delete Rolls.
Step 5 In the confirmation dialog box, click Ye s.
Step 6 Return to your originating procedure (NTP).
DLP-F357 Cancel a Roll
Caution If you click cancel while performing a Dual roll in Manual mode and have a valid signal detected on both
rolls, you will see a dialog box stating that this can cause a traffic hit and asking if you want to continue
with the cancellation. Cisco does not recommend cancelling a dual roll once a valid signal has been
detected. To return the circuit to the original state, Cisco recommends completing the roll, then using
bridge and roll again to roll the circuit back.
Step 1 From the node or network view, click the Circuits > Rolls tabs.
Step 2 Click the rolled circuit that you want to cancel.
Step 3 Click Cancel.
Step 4 Return to your originating procedure (NTP).
DLP-F358 Provision a Multirate PPM
Purpose This task cancels a roll. When the roll mode is Manual, you can only cancel
a roll before you click the Complete button. When the roll mode is Auto,
cancel roll is only allowed before a good signal is detected by the node or
before clicking the Force Valid Signal button. A dual or single roll can be
cancelled before the roll state changes to ROLL_COMPLETED.
Tools/Equipment None
Prerequisite Procedures DLP-F181 Log into CTC, page 16-34
NTP-F181 Bridge and Roll Traffic, page 7-5
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher
Purpose This task provisions multirate PPMs in CTC.
Tools/Equipment None
Prerequisite Procedures DLP-F181 Log into CTC, page 16-34
Required/As Needed Required for 4PIO modules
Onsite/Remote Onsite or remote
Security Level Provisioning or higher