user manual
Table Of Contents
- Cisco Content Engine 511 and 566 Hardware Installation Guide
- Contents
- Preface
- Introducing the Content Engine
- Preparing to Install the Content Engine
- Installing the Content Engine
- Installing Hardware Options
- Troubleshooting the System Hardware
- Maintaining the Content Engine
- Index

3-9
Cisco Content Engine 511 and 566 Hardware Installation Guide
OL-5756-01
Chapter 3 Installing the Content Engine
Installing a CE-511 or CE-566 Unit
Figure 3-7 Attaching the Slide Rails to the Rack
Step 5
Align the slide rail assembly to the front flange on the rack, and insert and tighten
two M6 screws to secure the slide rail to the front flange. (See Figure 3-7.)
Repeat Step 4 and Step 5 to install the other slide rail assembly.
Note If it is necessary to adjust the length of the slide rail, loosen the
adjustment screw (labeled 2 in Figure 3-7) on the rear of the slide rail;
then adjust the length of the slide rail and tighten the adjustment screw.
1 Tab 2 Adjustment screw
3 Rear flange
Rear
Front
83199
1
3
2