Network Device Installation Guide
Send documentation comments to mdsfeedback-doc@cisco.com.
F-5
Cisco MDS 9500 Series Hardware Installation Guide
OL-17467-02
Appendix F Site Planning and Maintenance Records
Site Preparation Checklist
5 Cable and interface equipment
evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment
(transceivers)
6 EMI
3
evaluation:
• Distance limitations for
signaling
• Site wiring
• RFI
4
levels
1. Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
2. UPS = uninterruptible power supply
3. EMI = electromagnetic interference
4. RFI = radio frequency interference
Table F-1 Site Planning Checklist (continued)
Task No. Planning Activity Verified By Time Date