Chapter 2 Installing the Cisco 7201 Router
Connecting Power
Figure 2-24 Stripping the DC-Input Power Ground Wire
Step 3 If your ground wire is insulated, use a wire stripping tool to strip the 18-gauge wire, (or 16-gauge, but
not smaller than the supply conductor) ground wire to 0.5 inch (12.7 mm)
+ 0.02 inch (0.5 mm) as shown
in
Figure 2-24.
Step 4 Slide the open end of the ground lug over the exposed area of the 18-gauge wire.
Step 5 Use a crimping tool to crimp each ground wire to a ground lug.
Figure 2-25 Placing the Ground Lugs, Star Washers, and Nut
Step 6 Place the ground lugs, star washers, and nut on the grounding stud in this order:
a. Star washer
b. Ground lug
c. Star washer
d. Ground lug
e. Nut
Step 7 Tighten the nut to complete the installation.