- Cisco Nexus 7000 Series Manual
Send document comments to nexus7k-docfeedback@cisco.com
E-2
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-18634-01
Appendix E Site Preparation and Maintenance Records
Contact and Site Information
Contact and Site Information
Use the following worksheet (Table E-2) to record contact and site information.
Power evaluation:
  • Input power type
  • Power receptacles
  • Receptacle proximity to the equipment
  • Dedicated (separate) circuits for power 
redundancy
  • UPS for power failures
  • Grounding: proper gauge wire and lugs
  • Circuit breaker size
Grounding evaluation:
  • Data center ground
Cable and interface equipment evaluation:
  • Cable type
  • Connector type
  • Cable distance limitations
  • Interface equipment (transceivers)
EMI evaluation:
  • Distance limitations for signaling
  • Site wiring
  • RFI levels
Table E-1 Site Planning Checklist (continued)
Planning Activity Verification Time and Date
Ta b l e  E-2 Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State










