Integrated Services Router Installation Guide
6
Installing Memory and Power Over Ethernet in Cisco 880 Series Integrated Services Routers
OL-16194-01
Installing Power Over Ethernet
Step 2 Locate the three metal standoff holes on the system board. See Figure 4 for the location of the PoE
connector. Two standoff holes are identified by a star pattern surrounding the hole; the third hole has a
screw attached to it.
Figure 4 PoE Connector
Step 3
Remove the screw from the third hole.
1 PoE connector 3 Standoff hole with screw
2 Standoff holes with star pattern
241979
1
3
2