Network Router User's Manual

Configuring SVCs, PVCs, SoftPVCs, PVPs, and VPTunnels 3-23
Configuring VP Tunnels
Verify
When the VP tunnel is configured on both ends and the connection is up, the AutoCfgState
displays “completed.”
Switch# show atm interface atm 3/0/2.99
Interface: ATM3/0/2.99 Port-type: vp tunnel
IF Status: UP Admin Status: up
Auto-config: enabled AutoCfgState: completed
IF-Side: Network IF-type: NNI
Uni-type: not applicable Uni-version: not applicable
<Information omitted.>
Switch#
Switch# show atm vp
Interface VPI Type X-Interface X-VPI Status
ATM3/0/2 99 PVP TUNNEL
Switch#