Instructions
Table Of Contents
1. VERIFICATION UPON RECEPTION
Check the following points upon receiving the unit:
a) The unit meets the specifications described in your order.
b) The unit has not suffered any damage during transport.
c) Perform an external visual inspection of the unit prior to switching it on.
d) Check that it has been delivered with the following:
- An installation guide,.
If any problem is noticed upon reception, immediately contact the transport com-
pany and/or CIRCUTOR's after-sales service.
2. PRODUCT DESCRIPTION
The CEM M-ETH optical-electric interface converts the optical service port of any unit of the CEM
range into an Ethernet port with MODBUS/TCP protocol.
The unit features:
- 3 indicator LEDs: POWER, LINK and LINK/ACT.
The unit is installed on 2-step DIN rails, on the left of any unit of the CEM range.
6
CEM M-ETH
Instruction Manual










