Installation manual

PVT-MCT10A-EN Page | 4
1 General Information
1.1 Bulk Packaging
Large orders of MCT panels are shipped in bulk on reusable pallets. The MCTs are integral to
the shipping pallet and must be disassembled from the pallet to be unloaded. Additional parts
accompany the MCT shipping pallets in standard corrugated packaging.
1.2 Domestic Shipment
Units purchased within North America will be shipped via a flat bed truck. The MCT units are
stacked in sets of five (5) in reusable wooden pallets. To unload the MCT’s from the pallets the
MCT’s must be removed one at a time. This is recommended to be done when the units are
ready to be lifted onto the roof. For a more detailed instruction how to do this please refer to
the Unpacking the MCT-HT section in the manual
1.3 Sling Kit (Recommended Option)
Chromasun recommends the use of the optional Chromasun Sling Kit accessory. The four
legged bridled nylon strap kit is designed to be used with a crane to transport MCT panels onto
the roof by latching onto the lift points located at each corner of the MCT. The Sling Kit portion
of this installation manual was written for use with our Sling Kit. If you choose to not use our
Sling Kit please consult an engineer for a safe alternative lifting method using the data found in
the weight and measurement section.