Installation manual
Page | 29 PVT-MCT10A-EN
Figure 9: MCT Piping Interconnect
NOTE: For parallel connections, have the MCTs plumbed to a manifold (not provided) and then
follow the piping outlined in the Basis of Design (BOD) document.
The included steel pipes are to be welded to the heating fluid pipes (receivers) on the MCT.
Figure 10: MCT Piping Interconnects. 3 MCT's in Series