Installation manual

PVT-MCT10A-EN Page | 22
Step 4.
Clamp down the front of the MCT using a
strut nut, a stand clamp, a washer, and a
bolt.
Step 5.
Place the next MCT down using the same
methods described for the first MCT.
Step 6.
After lowering the next MCT, place two
spacer wedges between the MCT’s taking
caution to not place the blocks on the weld
so that the blocks are seated flush.
Then push the next MCT up against the
previous MCT. Taking caution not to push
too hard, but just enough so that the MCT’s
are butted up against the spacer blocks.