Installation manual

Page | 15 PVT-MCT10A-EN
Step 3.
Remove the two triangle pieces from one side
of the crate only to maintain structural stability.
Each side is held in place by 13X 2.5” #10 wood
screws. (26 total)
Step 4.
Remove the two rectangular end pieces.
Each end piece is held in place by 2X 2.5” #10
wood screws. As well as 2X 2” 3/8” hex cap
bolts.
Step 5.
Crane the MCT unit away by connecting to the
4 lifting holes located at each corner of the
MCT.