Warnings and Precautions
Rack Precautions
Processor Precautions
• Ensure that the leveling jacks on the bottom of the rack
are fully extended to the floor with the full weight of the
rack resting on them.
• In single rack installation, stabilizers should be attached to
the rack. In multiple rack installations, the racks should be
coupled together.
• Always make sure the rack is stable before extending a
component from the rack.
• You should extend only one component at a time.
Extending two or more simultaneously may cause the rack
to become unstable.
Failure to comply may result in equipment damage.
• Determine the placement of each component in the rack
before you install the rails.
• Install the heaviest components on the bottom of the rack
first, and then work up.
• The TVC-700 weighs approximately 72 lbs. (32.7 kg) when
fully loaded. When lifting the system, 2 people at either
end should lift slowly with their feet spread out to
distribute the weight. Always keep your back straight and
lift with your legs.
• Use a regulating uninterruptible power supply (UPS) to
protect the processor from power surges and voltage
spikes and to keep your system operating in case of a
power failure.
• Allow any hot plug drives and power supply modules to
cool before touching them.
• Always keep the rack’s front door and all panels and
components on the processors closed when not servicing
to maintain proper cooling.