Install TVC-700
Overview
This chapter provides a quick setup checklist for installing the TVC-700
processor. Following these steps in the order given should enable you to
have the system operational within a minimum amount of time.
Unpack the System
You should inspect the box the TVC-700 shipped in and note if it was
damaged in any way.
Decide on a suitable location for setting up and operating the TVC-700.
It should be situated in a clean, dust-free area that is well ventilated.
Avoid areas where heat, electrical noise and electromagnetic fields are
generated. You will also need it placed near a grounded power outlet.
Prepare for Rack Mounting Setup
The box the TVC-700 was shipped in could include two sets of rail
assemblies (if ordered), two rail mounting brackets and the mounting
screws you will need to install the system into the rack. Follow the steps
in the order given to complete the installation process in a minimum
amount of time. Please read this section in its entirety before you begin
the installation procedure outlined in the sections that follow.
Choose a Setup Location
Leave enough clearance in front of the rack to enable you to open the
front door completely (~25 inches) and approximately 30 inches of
clearance in the back of the rack to allow for sufficient airflow and ease
in servicing.
This product is for installation only in a Restricted Access Location
(dedicated equipment rooms, service closets and the like).