Specifications

Planning for Cables
3-4 Stratus ftServer V 2302, V 4304, and V 6308 Systems: Site Planning Guide (R624)
To accommodate cables from your system, make sure to provide:
One or two telephone lines:
One telephone line for use when calling for service
One telephone line for the RSN modem
Ethernet jacks, switches, or hubs, as needed
Two UPS units, within reach of the power cords from the PDUs
For external components, AC wall outlets within reach of the power cords from the
components
Make sure that cables you plan to connect to the system are long enough to reach
between the system and external components or connections. For information about
specific cables and power cords, see the following:
“Power Cord Summary” on page 2-9
Chapter 4, “Communications Line Planning”
Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for information
about cable lengths for peripheral components
Figure 3-2 illustrates various cabling considerations.