Specifications

Site Planning Checklist
1-4 Stratus ftServer V 2302, V 4304, and V 6308 Systems: Site Planning Guide (R624)
Planning for Network Connectivity
The system contains four embedded 10/100/1000 megabits-per-second (Mbps)
Ethernet ports. Will your system additionally include any of the following PCI
adapters for network communications? If so, in Table 1-1, indicate the total number
of ports, and plan network connections for all Ethernet ports you will use.
Planning for Optional Components
To plan for the tape-drive and storage enclosures in your system, see the Stratus
ftServer Systems: Peripherals Site Planning Guide (R582) for descriptions of the
enclosures and the names of the required PCI adapters.
Planning AC Power
Have you selected and purchased two UPS units for each ftServer system?
What optional components will you use?
What are the HVAC and AC power requirements of all optional components?
What are the lengths and types of the power cords that are provided for the optional
components?
What type of AC receptacles do you need to provide?
Is the AC power service wired properly?
Planning Space for Your System
Will your system and its external components fit where you plan to place them?
What are the lengths and types of the interface and communications cables that
will connect to your system?
Have you created a sketch of how you plan to arrange the system at the installation
site? Consider the available cable lengths, the placement of external devices, and
the location of network and voice communication connections.
On the sketch, show the following:
Location of the system and its external components
Power cords, and telephone and interface cables
Locations of AC power receptacles, phone jacks, Ethernet jacks, switches, and
hubs
Table 1-1. Ethernet PCI Adapters
Adapter Total Number of Ports
U776V Quad-Port Fiber Gigabit Ethernet Adapter
U578V Quad-Port Copper Gigabit Ethernet Adapter