Specifications
Site Planning for ftServer V 2302, V 4304, and V 6308 Systems 1-1
Chapter 1
Site Planning for ftServer V 2302,
V 4304, and V 6308 Systems
1-
For an overview of required information and tasks you need to perform to prepare a site
for ftServer V 2302, V 4304, and V 6308 systems, see:
• “Site Planning Overview” on page 1-1
• “Site Planning for Fault-Tolerant Systems” on page 1-3
• “Site Planning Checklist” on page 1-3
• “Preparing to Install a System” on page 1-5
• “System Documentation” on page 1-7
• “Safety Notices” on page 1-7
Site Planning Overview
Site planning for fault-tolerant systems includes:
• Electrical power planning
Provide electrical power sources that meet the requirements of the system and
optional components, optionally including the purchase of a qualified
uninterruptible power supply (UPS).










