Specifications

Contents iii
Contents
Preface vii
1. Site Planning for ftServer V 2302, V 4304, and V 6308 Systems 1-1
Site Planning Overview 1-1
Site Planning for Fault-Tolerant Systems 1-2
Planning for Cables 1-3
Site Planning Checklist 1-5
Preparing to Install a System 1-7
Preparing to Take Delivery of a System 1-8
Moving the System to the Installation Site 1-8
System Documentation 1-9
Safety Notices 1-10
2. AC Power Planning 2-1
AC Power Overview 2-1
Redundant Power Sources 2-1
AC Power and HVAC Worksheets 2-2
Selecting a UPS Unit for ftServer Systems 2-4
AC Power Connections to Qualified UPS Models 2-7
Power Cord Summary 2-8
Main Cabinet Ground Cables 2-9
3. Space and Component Location Planning 3-1
RSN Connections 3-1
Fibre Channel Connections 3-2
UPS Connections 3-3
Component Location and Cabling Summary 3-3
Room Requirements 3-5
Cabinet Mounting and Leveling Considerations 3-7
Creating a Floor Plan 3-8