
11
REV: 16/03/01
Operating Manual
945012.066
3.- Place the equipment on the open side
of the box, leaving the flaps of the box
open underneath the equipment.
5.- Remove the protective materials from
the unit.
6.- The equipment is now ready for con-
nection and start-up.
4.- Lift the box off.