Specifications
Installation Instructions PG1A, PG2A
7
Figure 5
2. Place projector inside the projector guard (See Figure 5)
NOTE: The front fillers serve two different purposes, and the
number of fillers varies between the PG-1A and PG-2A.
The front filler(s) can be installed to accommodate the
various projector lens positions.
3. Check the position of the front filler(s) to ensure the
projector lens is unobstructed.
4. To move the filler(s), remove the two security screws from
each filler.
5. Change the filler(s) position as necessary, and reinstall the
security screws.
6. Remove the projector from the projector guard.
Install Projector on RPA/RPM
1. Ensure the SLB is installed on the projector. (See Figure 6)
If the SLB needs to be installed, install it according to the
installation instructions provided with the SLB.
2. To connect the RPA to a new projector, refer to the
installation instructions provided with the RPA.
3. For a pole-mounted RPA, slide the slotted openings on the
RPA into the threaded studs on the SLB. (See Figure 6)
Fasten the RPA to the SLB with thumbnuts and
handtighten.
Figure 6
Install Projector Guard on Pole-Mounted
Projector
1. Remove the four 1/4" flat washers (K) and four 1/4" hex nuts
(P) from on top of the RPA/RPM mount. (See Figure 7)
Figure 7
2. Slide the projector guard (A or B) into position over the
projector, while aligning the slots on the projector guard with
the screws in the RPA/RPM mount. (See Figure 8)
3. Align the projector to sit evenly in the projector guard (A or
B).
4. Reinstall the 1/4" hex nuts (P) and 1/4" washers (K) onto the
screws (H). (See Figure 8)
Removable
Leave two screws
in to make a
hinged door
filler bar
(PG2A shown)
Filler Bar
Security
Screws
RPA/RPM Mount
Thumbnuts
Threaded
Studs
SLB
x 4










