INSTALLATION INSTRUCTIONS Locking Projector Mount RPAA1, B1, C1
RPAA1, B1, C1 Installation Instructions DISCLAIMER CSAV, Inc., and its affiliated corporations and subsidiaries (collectively, "CSAV"), intend to make this manual accurate and complete. However, CSAV makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product.
Installation Instructions RPAA1, B1, C1 LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación Perforar Befestigungsteil lösen Bohrloch Desapertar fixador Fazer furo Allentare il fissaggio Praticare un foro Be
RPAA1, B1, C1 Installation Instructions TOOLS REQUIRED FOR INSTALLATION PARTS Q (1) S (1) 5/32" T (8) U (4) V (4) R (4) O (1) 3/32" 4
Installation Instructions RPAA1, B1, C1 ASSEMBLY AND INSTALLATION Installing Threaded Pipe and RPAA1 Outer Sleeve 6. Thread RPAA1 sleeve up onto pipe by turning counterclockwise until hand tight. (See Figure 3) WARNING: IMPROPER INSTALLATION CAN RESULT IN SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! Structural members MUST be capable of supporting five times the combined weight of all equipment being mounted. 1.
RPAA1, B1, C1 Installation Instructions 2 (T) x 4 (U) x 4 4 3 Figure 7 Attaching Projector to Security Mount Drawer Figure 5 Attaching Projector Security Legs 1. 1. Align projector and security mount drawer so that the projector is oriented correctly. 2. Remove the paper backing from the adhesive washers (V) and attach projector to drawer using adhesive washers (V) and thumbnuts (P) over the security legs (R).
Installation Instructions RPAA1, B1, C1 Security Mount Drawer RPAA1 Outer Sleeve 5. Adjust projector to desired roll. 6. Tighten adjustment screws. Yaw The yaw was adjusted when the RPAA1 was attached to the pipe. If the yaw needs to be adjusted further, follow Steps 1-4 under Rough Alignment of RPAA1. Locking the RPAA1 After all installation and adjustment steps have been completed, lock the RPAA1.
RPAA1, B1, C1 Installation Instructions USA/International Europe Asia Pacific 8802-000253 2007 Chief Manufacturing www.chiefmfg.com 04/07 A P F A P F A 8401 Eagle Creek Parkway, Savage, MN 55378 800.582.6480 / 952.894.6280 877.894.6918 / 952.894.6918 Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands +31 (0)40 2668620 +31 (0)40 2668615 Room 30I, Block D, Lily YinDu International Building LuoGang, BuJi Town, Shenzhen, CHINA.