User's Manual

9
⑪"Cable tail clamp (1 piece)
Figure 6 ADU Installation Diagram
!! Step 3 Install BDU
1)! Fix BDU with 4 M4 screws;
2)! The BDU should be installed in a flat place, and the space for observing the
indicator should be reserved after installation;
!! Step 3 Connect power supply and cable
1)! Insert the special power line into the terminal power interface [2], the power
input voltage is DC 10.8 V~31.2 V;
2)! Connect the end of the TNC interface of RF cable from ADU to the terminal
antenna interface [6]. The cable routing should be standardized to be away
from radiation and heat sources, and the cable should be fixed at appropriate
intervals. Redundant cables should be coiled up and hidden;
3)! Screw the Wifi antenna (attached with the equipment) into the terminal Wifi
interface [7], and place the Wifi antenna in the upright position;
!! Step 4 Startup
1)! Dial the power switch [12] from the “0” position to the “1” position;
2)! When the terminal enters the startup state and all the indicators are green, the
startup is completed;
!! Step 6 Connect the terminal
1)! The terminal can be accessed by wire or Wi-Fi using a computer, mobile phone,
tablet computer or the like;
"! Wired access method: use a special network cable (see Figure 1) with one
end being connected to the terminal network interface [3] and the other end
being the RJ45 standard network interface that is connected to external
devices;
"! Wi-Fi access method: search for Wi-Fi hot spots sp@ceon_xxx and
connect hot spots;
#! Wi-Fi default password: 12345678;
2)! Log in to the terminal to check the device state and configure the device;
"! Web login: enter the device IP address 192.168.1.5, open the login page,
enter the user name and password and log in to the Web;
#! Default administrator user: admin, password: 123456
#! Default common user: test, password: 123456
"! APP login: download and install BGAN APP, run APP, click login, enter