Installation Manual
PX/QX with Coupler Installation Manual Version *61
Single Aisle Wiring
The single aisle installation is the most common PX/QX with Coupler application which best
ut
i
l
izes the PAB-SAB configuration (see Figure 14 Single Aisle). A typical single aisle installation
consists of a PX (QX) primary antenna (PAB), a secondary antenna (SAB), a power supply and a
cable kit (packaged with secondary antenna). It is recommended to start SAB wiring first, then
wire the PAB. Connect the power cable last.
Figu
re 14 Single Aisle
Secondary antenna (SAB) wiring
Step 1: Open the base cover.
Step
2: Plug the pre-terminated RG59 coax cable onto coupler board J5, then mount two (2)
ferrite clippers close to the connector (see Figure 6 RG 59 Coax cable wiring diagram).
Note: It is recommended to leave the pre-terminated coax cable end at SAB location where the
cable was laid out.
Step 3: Connect the SAB Light cable to the wire terminal LT+ (RED) / LT- (Black).
Step 4: Inspect wiring and connections, confirm coupler board jumper settings (see Figure 15
SAB Coupler Board Jumper Settings).
Step 5: Put the base cover back and secure.