User Manual
16
To make a measurement, you must program at least:
the calculation method (see §4.5),
the connection (see §4.6)
and the ratios of the sensors (see §4.7).
The measuring leads must be connected to the circuit to be measured as shown by the following diagrams.
3.3.1. SINGLE-PHASE NETWORK
3.3.2. SPLIT-PHASE NETWORK
3.3.3. THREE-PHASE NETWORK
Figure 12: 2-wire single-phase connection
Figure 13: 3-wire split-phase connection
Figure 14: 3-wire three-phase connection Figure 15: 4-wire three-phase connection
In the case of a 3-wire three-phase network, you are not obliged to connect all of the terminals in current.
For 3-wire three-phase, indicate the current sensors that will be connected: all 3 sensors (3A) or only 2 (A1 and A2, or A2 and
A3, or A3 and A1).
For 4-wire three-phase, indicate the voltages that will be connected: all 3 voltages (3V) or only 2 (V1 and V2, or V2 and V3, or V3
and V1).