User Instructions

SOOT DOORS
PRE LIGHTING CHECK
COMMISSIONING
It is possible to pass a 16 inch diameter sweep’s brush through the
appliance but in most back outlet installations it will be necessary to
have a soot door to enable the chimney to be swept. The optional
vertical rear flue connector does allow the chimney to be swept
through the stove.
Soot doors may either be in the actual brickwork of the chimney or
in the register plate. Various positions of soot doors are shown in
Figs. 5 to 8.
Ensure that the throat plate is fitted in the roof of the appliance. The
location and positioning of the throat plate is shown in Fig. 3.
Check that the front fence is fitted correctly and that the door closes
properly.
On completion of the installation allow a suitable period of time for
the fire cement and mortar to dry out before lighting the fire. If no
grate is fitted, make a layer of ash or sand on the base of the stove
before lighting. Check to ensure that smoke and fumes are taken
from the appliance up the chimney and emitted safely. Also check all
joints and seals. On completion of the installation and commissioning
please leave the operating instructions with the customer and advise
them on the use of the appliance.
12
®
INSTALLATION INSTRUCTIONS
Register Plate
With Soot Door
Alternative
Soot Door Positions
Fig. 8. Horizontal Register Plate With Optional
Vertical Rear Flue Connector
charnwood