Installation & Assembly
A
Installation Instructions
1. Determine inside/ceiling or outside mount.
A. Identify the Left and Right brackets and open.
B. Hold each bracket in the corner of window
frame. Mark screw holes. NOTE: For flush
valance mount, align the front of the mounting
brackets 1” in from front of window frame.
C. Center and mark center support bracket (for
blinds 48” & wider).
Inside/Ceiling Mount
OPTION A
LEFT BRACKET RIGHT BRACKET
Outside Mount
OPTION B
2 7
2. MOUNT BRACKETS
INSIDE MOUNT
When inside mounting, you can choose to mount through the side bracket wall (option A) or the back
bracket wall (B).
B
C
Operating Instructions
TO BRING BLIND DOWN TO WINDOW SILL:
Pull blind down to the window sill by pulling
down on the bottom rail. Note: You may pull
blind all the way down to the window sill or
stop at any desired height.
TO FULLY OPEN BLIND:
Push blind up by pushing up on the bottom
rail. Note: You may fully open blind to top of
window or stop at any desired height.
TO TILT SLATS:
Twist wand left and right to open and close
slats to your preference.
TO CLEAN BLIND:
Dust gently with clean, damp non-abrasive
cloth.